3.4 Critical Paths (AS 91576)
General Information
Critical Paths (AS 91576) is a 2 credit internal.
Critical Paths is a great standard that is very visual. It explored the scheduling of tasks related to a larger project. We usually run this as part of our general Level 3 Mathematics course.
3.4 Critical Paths Resources
No resources at this time.
Standards
- 3.1 Conic Sections (no resources available)
- 3.2 Linear Programming
- 3.3 Trig (no resources available)
- 3.4 Critical Paths (no resources available)
- 3.5 Complex Numbers (no resources available)
- 3.6 Differentiation (no resources available)
- 3.7 Integration (no resources available)
- 3.8 Time Series
- 3.9 Bivariate Data
- 3.10 Inference
- 3.11 Experiments (no resources available)
- 3.12 Reports (no resources available)
- 3.13 Probability Concepts
- 3.14 Probability Distributions
- 3.15 Simultaneous Equations
